Please have the following information and documents ready before starting your application:
Step 1. Fire Safety Permits
A. Pre-Engineered Extinguishing System Permit Application Submission
The Beverly Hills Permit Center processes permit applications for pre-engineered extinguishing systems, such as kitchen hood wet-chemical and clean agent systems.
A permit is required before any installation, modification, repair, or removal of these systems in new or existing facilities may begin. Performing work without a permit is prohibited and may result in violations or penalties.
Permit Is Required For:
B. DAS (Distributed Antenna System) Permit Application Submission
The Beverly Hills Permit Center processes permit applications for public safety radio enhancement systems (DAS/BDA).
A permit is required before installation, modification, or testing of a DAS to ensure reliable in-building emergency responder radio coverage.
Permit Is Required For:
C. Two-Way Emergency Communication Permit Application Submission
The Beverly Hills Permit Center processes permit applications for two-way emergency communication systems, such as systems used in areas of refuge, stairwells, and similar locations.
A permit is required before installation or alteration to ensure code-compliant emergency communication for occupants and responders.
Permit Is Required For:
D. CO2 Monitoring System Permit Application Submission
The Beverly Hills Permit Center processes permit applications for carbon dioxide (CO2) monitoring systems associated with beverage dispensing, cultivation, laboratories, and storage or use areas.
A permit is required before installation or modification to ensure occupant safety, alarm setpoints, ventilation interlocks, and notification functions are compliant.
Permit Is Required For:
E. Evacuation Map Permit Application Submission
The Beverly Hills Permit Center reviews submittals for evacuation maps to verify accuracy, readability, and posting locations for occupant safety.
A permit or approval is required for new or revised maps to ensure conformance with applicable code requirements and building features.
Permit or Approval Is Required For:
Final Inspection & Compliance
All permitted work must pass required inspections. Approval is granted after verification that installations, testing, and documentation comply with the Beverly Hills Municipal Code, California Building Standards Code, and applicable NFPA standards.
Step 2. Staff Review
City staff will review your application and contact you if additional information is needed. Please allow approximately two (2) to three (3) business days for staff review. After your request is finalized and submitted, you will be assigned a reference number. You will also receive a notification email with additional instructions. Please include your reference number if you contact staff with questions or need to provide clarification regarding your application. Permit staff can be reached by email at FDPermits@beverlyhills.org.
Step 3. Payment
After staff processes your application, you will receive a CitySmart notification email with additional information, a breakdown of plan review and/or permit fees, and a link to the online payment portal.